Installation & Commissioning

Professional Installation Services for Your Forging & Stamping Equipment

500+
Installations Completed
99.8%
Success Rate
7-14
Days Average Lead Time
30+
Countries Served

Installation Process

1

Pre-Installation Survey

Site inspection, foundation preparation assessment, and installation planning

2

Equipment Delivery

Secure transportation and on-site unloading of forging equipment

3

Installation

Professional assembly and positioning with precision alignment

4

Commissioning

System testing, calibration, and trial runs to ensure optimal performance

Pre-Installation Checklist

Site Requirements

Floor Load Capacity

Minimum 5-ton/m² floor bearing capacity for 1000T+ equipment

Foundation Preparation

Concrete foundation with anchor bolts and vibration isolation

Clearance Space

Minimum 2m clearance around equipment for maintenance access

Crane Access

Overhead crane or forklift with sufficient lifting capacity

Power & Utilities

Power Supply

3-phase 380V/415V, 50Hz, with proper grounding and circuit protection

Compressed Air

Clean, dry compressed air at 0.6-0.8 MPa for pneumatic systems

Hydraulic System

Hydraulic oil preparation according to equipment specifications

Cooling Water

Industrial cooling water supply for lubrication system

Safety & Documentation

Safety Certifications

Operator safety training and PPE equipment availability

Technical Documents

Installation manuals, electrical diagrams, and maintenance guides

Permits & Approvals

Local regulatory permits for equipment installation and operation

Insurance Coverage

Equipment and liability insurance during installation period

Commissioning Timeline

Day 1-2: Equipment Inspection & Foundation Verification

2 Days

Thorough inspection of equipment components and verification of foundation compliance

  • Visual inspection of all components
  • Foundation leveling and bolt verification
  • Documentation review and verification

Day 3-5: Installation & Assembly

3 Days

Complete assembly of main machine components and auxiliary systems

  • Main frame and press assembly
  • Electrical and hydraulic system installation
  • Lubrication and pneumatic system setup
  • Safety device installation and testing

Day 6-8: Calibration & Testing

3 Days

System calibration, functional testing, and performance verification

  • Pressure and stroke calibration
  • Safety interlock system testing
  • Load testing at various pressures
  • Control system programming and testing

Day 9-10: Trial Production & Operator Training

2 Days

Trial production runs and comprehensive operator training

  • Sample part production validation
  • Operator training and certification
  • Maintenance personnel training
  • Handover of documentation and manuals

Site Requirements

Essential Site Preparation Requirements

Space Requirements

Allow 1.5x equipment footprint for operation and maintenance access

Load Capacity

Floor load capacity ≥ equipment weight / foundation area × 1.5

Ambient Conditions

Temperature: 5-40°C, Humidity: 30-80% RH

Power Requirements

Stable 3-phase power with ±10% voltage fluctuation tolerance

Ventilation

Adequate ventilation for oil mist and heat dissipation

Safety Equipment

Fire extinguishers, emergency stop systems, and safety barriers

Our Installation Team

Project Manager

Coordination of installation schedule, resource allocation, and client communication

Technical Engineers

Senior engineers with 10+ years experience in forging equipment installation

Training Specialists

Comprehensive operator and maintenance training program delivery