Installation & Commissioning
Professional Installation Services for Your Forging & Stamping Equipment
Installation Process
Pre-Installation Survey
Site inspection, foundation preparation assessment, and installation planning
Equipment Delivery
Secure transportation and on-site unloading of forging equipment
Installation
Professional assembly and positioning with precision alignment
Commissioning
System testing, calibration, and trial runs to ensure optimal performance
Pre-Installation Checklist
Site Requirements
Floor Load Capacity
Minimum 5-ton/m² floor bearing capacity for 1000T+ equipment
Foundation Preparation
Concrete foundation with anchor bolts and vibration isolation
Clearance Space
Minimum 2m clearance around equipment for maintenance access
Crane Access
Overhead crane or forklift with sufficient lifting capacity
Power & Utilities
Power Supply
3-phase 380V/415V, 50Hz, with proper grounding and circuit protection
Compressed Air
Clean, dry compressed air at 0.6-0.8 MPa for pneumatic systems
Hydraulic System
Hydraulic oil preparation according to equipment specifications
Cooling Water
Industrial cooling water supply for lubrication system
Safety & Documentation
Safety Certifications
Operator safety training and PPE equipment availability
Technical Documents
Installation manuals, electrical diagrams, and maintenance guides
Permits & Approvals
Local regulatory permits for equipment installation and operation
Insurance Coverage
Equipment and liability insurance during installation period
Commissioning Timeline
Day 1-2: Equipment Inspection & Foundation Verification
2 DaysThorough inspection of equipment components and verification of foundation compliance
- Visual inspection of all components
- Foundation leveling and bolt verification
- Documentation review and verification
Day 3-5: Installation & Assembly
3 DaysComplete assembly of main machine components and auxiliary systems
- Main frame and press assembly
- Electrical and hydraulic system installation
- Lubrication and pneumatic system setup
- Safety device installation and testing
Day 6-8: Calibration & Testing
3 DaysSystem calibration, functional testing, and performance verification
- Pressure and stroke calibration
- Safety interlock system testing
- Load testing at various pressures
- Control system programming and testing
Day 9-10: Trial Production & Operator Training
2 DaysTrial production runs and comprehensive operator training
- Sample part production validation
- Operator training and certification
- Maintenance personnel training
- Handover of documentation and manuals
Site Requirements
Essential Site Preparation Requirements
Space Requirements
Allow 1.5x equipment footprint for operation and maintenance access
Load Capacity
Floor load capacity ≥ equipment weight / foundation area × 1.5
Ambient Conditions
Temperature: 5-40°C, Humidity: 30-80% RH
Power Requirements
Stable 3-phase power with ±10% voltage fluctuation tolerance
Ventilation
Adequate ventilation for oil mist and heat dissipation
Safety Equipment
Fire extinguishers, emergency stop systems, and safety barriers
Our Installation Team
Project Manager
Coordination of installation schedule, resource allocation, and client communication
Technical Engineers
Senior engineers with 10+ years experience in forging equipment installation
Training Specialists
Comprehensive operator and maintenance training program delivery
Ready to Get Started?
Contact our team to schedule your installation and commissioning service
Installation & Commissioning
Professional Installation Services for Your Forging & Stamping Equipment
Installation Process
Pre-Installation Survey
Site inspection, foundation preparation assessment, and installation planning
Equipment Delivery
Secure transportation and on-site unloading of forging equipment
Installation
Professional assembly and positioning with precision alignment
Commissioning
System testing, calibration, and trial runs to ensure optimal performance
Pre-Installation Checklist
Site Requirements
Floor Load Capacity
Minimum 5-ton/m² floor bearing capacity for 1000T+ equipment
Foundation Preparation
Concrete foundation with anchor bolts and vibration isolation
Clearance Space
Minimum 2m clearance around equipment for maintenance access
Crane Access
Overhead crane or forklift with sufficient lifting capacity
Power & Utilities
Power Supply
3-phase 380V/415V, 50Hz, with proper grounding and circuit protection
Compressed Air
Clean, dry compressed air at 0.6-0.8 MPa for pneumatic systems
Hydraulic System
Hydraulic oil preparation according to equipment specifications
Cooling Water
Industrial cooling water supply for lubrication system
Safety & Documentation
Safety Certifications
Operator safety training and PPE equipment availability
Technical Documents
Installation manuals, electrical diagrams, and maintenance guides
Permits & Approvals
Local regulatory permits for equipment installation and operation
Insurance Coverage
Equipment and liability insurance during installation period
Commissioning Timeline
Day 1-2: Equipment Inspection & Foundation Verification
2 DaysThorough inspection of equipment components and verification of foundation compliance
- Visual inspection of all components
- Foundation leveling and bolt verification
- Documentation review and verification
Day 3-5: Installation & Assembly
3 DaysComplete assembly of main machine components and auxiliary systems
- Main frame and press assembly
- Electrical and hydraulic system installation
- Lubrication and pneumatic system setup
- Safety device installation and testing
Day 6-8: Calibration & Testing
3 DaysSystem calibration, functional testing, and performance verification
- Pressure and stroke calibration
- Safety interlock system testing
- Load testing at various pressures
- Control system programming and testing
Day 9-10: Trial Production & Operator Training
2 DaysTrial production runs and comprehensive operator training
- Sample part production validation
- Operator training and certification
- Maintenance personnel training
- Handover of documentation and manuals
Site Requirements
Essential Site Preparation Requirements
Space Requirements
Allow 1.5x equipment footprint for operation and maintenance access
Load Capacity
Floor load capacity ≥ equipment weight / foundation area × 1.5
Ambient Conditions
Temperature: 5-40°C, Humidity: 30-80% RH
Power Requirements
Stable 3-phase power with ±10% voltage fluctuation tolerance
Ventilation
Adequate ventilation for oil mist and heat dissipation
Safety Equipment
Fire extinguishers, emergency stop systems, and safety barriers
Our Installation Team
Project Manager
Coordination of installation schedule, resource allocation, and client communication
Technical Engineers
Senior engineers with 10+ years experience in forging equipment installation
Training Specialists
Comprehensive operator and maintenance training program delivery
Ready to Get Started?
Contact our team to schedule your installation and commissioning service